Mosquito Control Costs Overview
Larger properties typically require more resources and time, impacting the overall cost of mosquito control.
Different treatment methods, such as fogging or larviciding, vary in cost depending on complexity and equipment used.
Regular treatments may reduce long-term costs but can increase upfront expenses.
| Factor | Details |
|---|---|
| Property Size | Small yards (up to 1/4 acre): $50-$100 per treatment |
| Property Size | Large yards (over 1 acre): $150-$300 per treatment |
| Treatment Type | Larviciding: $40-$80 per application |
| Treatment Type | Fogging: $60-$120 per application |
| Service Frequency | Monthly treatments: $200-$600 annually |
| Service Frequency | Bi-monthly treatments: $150-$400 annually |
| Additional Services | Mosquito netting installation: $200-$500 |
| Additional Services | Standing water removal: $100-$300 |
The cost of mosquito control varies significantly based on property size, chosen treatment methods, and the frequency of services. Smaller properties generally incur lower costs, while larger areas require more extensive resources. Treatment options like larviciding tend to be more affordable per application, whereas fogging provides rapid coverage but may be more costly per session. Regular service schedules can help manage long-term expenses and improve effectiveness.
Installation costs range from $200 to $500, depending on property size and material quality.
Removing breeding sites can cost between $100 and $300, depending on the extent of the area.
Average costs are approximately $40 to $80 per application, tailored to property needs.
| Service | Average Cost |
|---|---|
| Larviciding | $40 - $80 per application |
| Fogging | $60 - $120 per application |
| Mosquito Netting Installation | $200 - $500 |
| Standing Water Removal | $100 - $300 |
| Mosquito Traps | $50 - $150 each |
| Insecticide Spraying | $75 - $150 per treatment |
| Barrier Treatments | $100 - $250 per treatment |
| Yard Drainage Improvements | $300 - $1,000 |
| Mosquito Misting Systems | $1,000 - $3,000 |
| Landscape Modification | $500 - $2,000 |